Paul Y. – iMax Limited

Paul Y. - iMax Limited (“Paul Y. - iMax”), the company set up between Paul Y. Engineering Group and iMax Modular of Singapore, synergises local and overseas experience on smart construction, as well as their collective expertise and ambition. The vision of Paul Y. - iMax is to further develop MiC technologies and applications during this new era of  construction.

 

Address:  11/F, Paul Y. Centre, 51 Hung To Road, Kwun Tong, Kowloon, Hong Kong
Tel:  (852) 2831 8184

Key Features

Copyright © Paul Y. - iMax

Patented Candle-Loc System


  • In-principle acceptance (IPA) granted from Buildings Department
  • Designed for multi-storey building
  • Allow fastening and on-site installation from the top of modules
  • No scaffolding is required
  • Installing a module in less than 15 minutes on average
  • No grouting for Candle-Loc System enables future relocation

Signature Projects

Copyright © Paul Y. Engineering Group

Temporary Quarantine Facilities at Mini Soccer Pitch of Sai Kung Outdoor Recreation Centre

Sai Kung, Hong Kong

Client: Architectural Services Department 
Project Role:
MiC Supplier  
Main Contractor:
Paul Y. Construction Company Limited
No. of Modules: 99
Type of Module  Steel
CFA/GFA: 4, 757 ㎡
Number of Floors: 3
Number of Units: 99
Project Period: 07 Feb 2020 - 30 Apr 2020 (84 days in total)
MiC Parts: 80% of exterior decoration and 90% of interior decoration were finished in the Malaysia factory including furniture and other fittings.
Other Project Features:
  • Three blocks of three-storey facilities provide 99 units in total
  • Completed in 84 days without delay despite Malaysia lockdown during project period
  • The units are in 3 meters wide which requires Wide Load Permit
  • Applied Just-in-Time (JIT) installation concept in tight site area
  • Completed installation of the last batch (44 units) within 12 hours (average 13min and 25sec per unit)
  • Handed over to the client after 6 days of the arrival date of last batch with completed interfacing works, E&M connections, testing and inspections

 

PROJECT VIDEO

 

Copyright © Paul Y. Engineering Group

Student Residence at Police School Road in Wong Chuk Hang

Wong Chuk Hang, Hong Kong

Client: The University of Hong Kong 
Project Role:
MiC Supplier
Main Contractor Paul Y. Construction Company Limited
No. of Modules: 884
Type of Module Hybrid
CFA 28, 000 ㎡
Number of Floors: 17
Number of Units: 1, 224
Project Period: Aug 2019 - May 2023
MiC Parts:
  • External cladding and part of the internal fittings are installed in advance by the factory, with packed furnishings for final commissioning
  • Internal mechanical, electrical and hydraulic are fully commissioned in factory, which are ready for connection and final commissioning on site
Other Project Features: 
  • A Pilot MiC project under the Development Bureau
  • Two 17-storey student residences accommodate around 1, 224 students
  • Three-level podium in G/F, 1/F and 2/F
  • Demonstration of the advantage of concurrent engineering which 2 years periods for civil and foundation works providing sufficient time for MiC design, statutory submission, mock up and mass production

 

PROJECT DETAILS

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 27.01.2021 11:07:06

Transitional Housing Projects

In order to relieve the acute shortage of housing, the HKSAR Government announced the three-year transitional housing target of 15,000 units in January 2020. Up to now, two MiC transitional housing projects were completed, including the Nam Cheong 220 by The Hong Kong Council of Social Service and the Junction of Sung Wong Toi Road and To Kwa Wan Road Project by Lok Sin Tong. United Court by Sheng Kung Hui will be commenced shortly. The largest project in Kong Ha Wai by Pok Oi Hospital was commenced in March 2021. Over 6,000 people will be homed by the end of 2022.

Update on the Progress of Supplying Transitional Housing

08.07.2021 Legislative Council of the HKSAR

江夏圍過渡性房屋計劃 - 首批示範單位落地元朗 (Chinese only)

10.06.2021 AluHouse

樂善堂社會房屋計劃「樂屋」 - 宋皇臺道及土瓜灣道交界組合屋項目 (Chinese only)

03.06.2021 Lok Sin Tong

江夏圍過渡性房屋項目正式動土 (Chinese only)

10.05.2021 City's Time

HOT TOPIC