BROAD Sustainable Built Technology Company Limited

Shanghai, China

BROAD Sustainable Built Technology Co. Ltd. (BSB), which is under Broad Group has 11 years of experience in prefabricated buildings. It has successively built more than 60 buildings with steel-structures and stainless steel. With mature prefabrication system and a very high factory rate, the construction videos had amazed the world with on-site installation of 3 floors a day, 57 floors in 19 days etc..

 

In 2009, Being plagued by the Wenchuan earthquake and climate change deterioration, BSB determined to develop the factory-made super energy-efficient steel structure buildings. From the very beginning, BSB has formulated 6 standards of sustainable building development: magnitude 9 earthquake resistance, 5 times more energy efficiency, 10 times longer lifespan, 100 times cleaner air, 100% steel structure, only 1% construction waste. 58 buildings of various types were successively built, all have met the above-mentioned 6 standards of sustainable buildings, and have widely received praise and recognition.

 

Since the outbreak of Covid19, Broad Group has launched a series of anti-epidemic products such as Ozone Disinfection Cabin and electrostatic virus decontamination machines. At the same time, it has provided more than 600 electrostatic purifier with powerful disinfection and sterilization functions for more than 50 hospitals around the world, such as “Huoshenshan” Hospital, Leishenshan Hospital and Fangcang Hospital in Wuhan. It has also donated more than 5,000 mobile lung protectors to medical personnel, traffic police, sanitation workers and other people who work on the front line in order to make contribution in anti-epidemic. Broad Group even made its first time to export modules to assist with South Korea to build an isolation hospital, for the project detail, please refer to “Overseas Significant Project” on this website.

Signature Projects

Courtesy of BSB

BROAD Town (Hunan)

Hunan, China

Dormitory (prototype) built in 1 day - BROAD Town (Hunan).

Courtesy of BSB

BROAD Pavilion at World Expo

Shanghai, China

BROAD Pavilion at World Expo built in 1 day in Shanghai.

Courtesy of BSB

COP16 Pavilion

Mexico

COP16 Pavilion built in 1 day in Mexico.

Courtesy of BSB

Multi-function building

Shanxi, China

Multi-function building built in 3 days in Shanxi.

Courtesy of BSB

Company HQ

Shandong, China

Company HQ built in 4 days in Shandong.

Courtesy of BSB

Residential apartment

Hubei, China

Residential apartment built in 3 days in Hubei.

Courtesy of BSB

Office building

Ningxia, China

Office building built in 9 days in Ningxia.

Courtesy of BSB

Business Innovation Center

Fujian, China

Business Innovation Center built in 3 days in Fujian.

Courtesy of BSB

Urban complex

Hunan, China

Urban complex built in 19 days in Hunan.

Courtesy of BSB

Hotel

Hunan, China

Hotel built in 8 days in Hunan.

Courtesy of BSB

Hotel

Shanxi, China

Hotel built in 7 days (the 58th building) in Shanxi.

    The information contained in this page has been authorised being uploaded.

     

    Disclaimer

    The CIC does not warrant or guarantee the accuracy and suitability of the information contained in this page in any particular case. The CIC disclaims all liabilities for any loss or damage to any person arising from or as a consequence of the use of or reliance on any information contained in or omitted from this page.

Last Updated: 31.12.2020 14:46:34

Transitional Housing Projects

In order to relieve the acute shortage of housing, the HKSAR Government announced the three-year transitional housing target of 15,000 units in January 2020. Up to now, two MiC transitional housing projects were completed, including the Nam Cheong 220 by The Hong Kong Council of Social Service and the Junction of Sung Wong Toi Road and To Kwa Wan Road Project by Lok Sin Tong. United Court by Sheng Kung Hui will be commenced shortly. The largest project in Kong Ha Wai by Pok Oi Hospital was commenced in March 2021. Over 6,000 people will be homed by the end of 2022.

Update on the Progress of Supplying Transitional Housing

08.07.2021 Legislative Council of the HKSAR

江夏圍過渡性房屋計劃 - 首批示範單位落地元朗 (Chinese only)

10.06.2021 AluHouse

樂善堂社會房屋計劃「樂屋」 - 宋皇臺道及土瓜灣道交界組合屋項目 (Chinese only)

03.06.2021 Lok Sin Tong

江夏圍過渡性房屋項目正式動土 (Chinese only)

10.05.2021 City's Time

HOT TOPIC